Ever felt that bone-chilling cold even when the heating on? An old, inefficient boiler could be the culprit! Luckily, boiler grants in the UK can help you upgrade to a brand new, energy-saving model. But how long does the whole boiler grant process take, from applying to getting that toasty warmth back? This guide will break it down for you in simple terms.
What Happens After You Apply for Boiler Grants?
When you apply for a boiler grant, several steps need to happen before your new boiler is installed. Here’s a general overview of the process:
- Eligibility Check: This is basically a procedure that homeowners or private tenants need to follow before applying to a boiler grant. It usually has a few questions that take only a few seconds to answer in either yes or no or choosing from a drop-down menu.
- Application Submission: Submitting your application is the next step. This usually takes a few minutes if you have all your information ready. You fill out and submit your application form. Some installers submit your application for free to make you uninterrupted.
- Application Review: Your application is reviewed to see if you meet the criteria. The installer (i.e. grant provider) will assess your application to see if you meet the eligibility criteria. They’ll verify your details and check your property to ensure it meets the grant requirements. You’ll typically hear back within a day or so on whether your application is approved.
- Call from a Specialist: If you’re eligible, a specialist will contact you to gather more necessary information. This ensures you’re working with a reputable and experienced professional.
- Document Verification: You’ll need to provide documents to prove your eligibility. These documents may include but are not limited to:
- Home Survey: An engineer visits your home to assess what needs to be done. The installer will reach out to schedule a free home survey at your convenience. During this visit, the installer will assess your current boiler setup, measure your heating requirements, and discuss the best boiler options for your home that fit within the grant scheme.
- Grant Approval: Your grant is officially approved. They will also clearly explain the amount of grant funding you’ll receive towards the total cost. Once you’re happy with everything and agree to proceed, the installer will schedule a date for the boiler installation.
- Boiler Installation: The new boiler is installed in your home.
Application Process Timeline
Here’s a breakdown of the estimated time for each stage:
- Checking Eligibility (2 minutes): This is a quick process that can be done in just a minute or so. You’ll usually answer questions about your boiler age, property type, and benefit receipt. After submitting your application, it typically takes about 3 to 7 days for the eligibility check. The organisation will review your application and see if you meet the basic criteria for the grant.
- Receive Call from Installer (5 minutes): If you’re eligible, a specialist will get in touch with you. This contact usually happens within a day or two after your eligibility is confirmed.
- Applying for Grant (5 minutes): Filling out the grant application form should take around 10 minutes. Most installers (like us) offer online applications for your convenience.
- Document Verification (3-7 Days): The installer will assess your application and conduct any necessary checks for verification. This typically takes 1-2 days based on your documents status. You’ll need to provide documents such as proof of income or benefits. This verification process can take around 3 to 7 days, depending on how quickly you can gather and submit the required paperwork.
- Survey Scheduling (1-2 Days): The installer will contact you to schedule a home survey at your convenience. Scheduling typically takes 1-2 days. An engineer will visit your home to see what kind of boiler you need and where it will go. Scheduling this visit can take about 1 to 2 weeks, depending on the engineer’s availability.
- Grant Approval (1-7 Days): After the survey, the installer will prepare a detailed quote outlining the new boiler cost, grant amount. Reviewing the quote and agreeing to proceed takes about 1-2 days. Once the survey is done, the final approval for your grant can take another 3 to 7 days. This is when the paperwork is finalised, and the grant is officially awarded.
- Boiler Installation (1 Day): Finally, the installation of your new boiler will be scheduled. This can take another 1 day. The actual installation might only take a day, but scheduling the installation can add some time.
Total Estimated Time
Adding up all the individual stages, the total estimated time to get your new boiler installed can range from 3 days to a few weeks. All depends on your documents and verification. If they are verified, on time, this may take only less than 3 days for a complete boiler installation. Otherwise, boilers usually…
So, keep in mind that this is just a rough schedule. Things could change. If a lot of people in your area want boiler handouts, it may take longer for your application to be processed. The evaluation and installation steps could take longer if your boiler needs a more complicated installation because of things like the way your heating system is set up or the type of boiler you have.
If you’re not set on a specific time, though, and area techs are available, the process may go more quickly than you thought. You can avoid delays by having all the necessary paperwork ready when you apply for the grant and by being honest with both the grant source and the dealer.
Factors that Shorten the Processing Time
Some factors can help speed up the process:
- Having All Documents Ready: Having all the necessary papers ready could speed up the process of document checking.
- Quick Responses: The process goes faster when you respond quickly to calls for information or documents.
- Flexible Scheduling: Being flexible with your schedule can help get the home survey and installation done sooner.
Is it Possible for My Boiler Installation to Take Over a Month?
Yes, it is possible. While the average time from start to finish is usually around a month, several factors can cause delays:
- High Demand: During colder months, more people apply for boiler grants, which can slow down the process.
- Document Delays: If you have trouble gathering the necessary documents, it can add extra time.
- Scheduling Conflicts: If the engineer or installation team has a busy schedule, it can take longer to get appointments.
Apply for Free Boiler Replacement Grants
If you are receiving any benefit from the UK Government you can apply for free boiler replacement grants.
Check your Eligibility Now
How to Streamline the Process?
To make the process as smooth and quick as possible, here are some tips:
- Prepare Early: Have all your documents ready before you apply.
- Stay in Touch: Keep in regular contact with the grant provider to stay updated on the status of your application.
- Be Flexible: Try to be as flexible as possible with your schedule for surveys and installation.
- Ask Questions: If you’re unsure about any part of the process, don’t hesitate to ask questions. This can help prevent any misunderstandings or delays.
In Summary
Getting a boiler grant might take a while, but you can speed up the process and keep problems to a minimum by being organised and knowledgeable about it. The whole process, from applying to installing, could take up to a month. However, you can speed it up by being proactive. If you want to apply for a boiler grant, you should get your paperwork ready as soon as possible and keep in touch with the grant company to make sure everything goes as planned.
Frequently Asked Question
The approval process can take around 3 to 7 days after the home survey is completed.
Yes, having all your documents ready and responding quickly to requests for information can help speed up the process.
Several factors, such as high demand or scheduling conflicts, can cause delays. Staying in touch with the grant provider and being flexible with your schedule can help avoid prolonged delays.
Common documents include proof of income, proof of benefits, and possibly a copy of your Energy Performance Certificate (EPC).
The installation itself typically takes one to two days, but scheduling the installation can take one to two weeks.